Sign In | Join Free | My chinacomputerparts.com
China Shandong Future Metal Manufacturing Co., Ltd. logo
Shandong Future Metal Manufacturing Co., Ltd.
Shandong Future Metal Manufacturing Co., Ltd.
Verified Supplier

1 Years

Home > Steel Pipe Steel Tube >

Payment Terms L/C T/T 30% Deposit for Custom Cast Iron Water Supply and Sewage

Shandong Future Metal Manufacturing Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
Shandong Future Metal Manufacturing Co., Ltd.
Visit Website
City: Liaocheng
Province/State: Shandong
Country/Region: China

Payment Terms L/C T/T 30% Deposit for Custom Cast Iron Water Supply and Sewage

Payment Terms L/C T/T 30% Deposit for Custom Cast Iron Water Supply and Sewage

Specification 1 Standard: ISO2531, EN545, EN598, etc 2 Size: DN80~2600mm 3 Material: Ductile Cast Iron GGG50 4 Pressure: PN10, PN16, PN25,PN40 5 Class: K9, K8, C25, C30, C40 6 Length: 6m, cut to 5.7m ...

Send your message to this supplier
 
*From:
*To: Shandong Future Metal Manufacturing Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)